Degree Project Procedure

Procedure for Final Year Project/Thesis

Degree Project Definition:

  1. Bachelor Level students are recommended to work in group (individually can also be done). Maximum number of student(s) for a hardware project is four, if approved by Degree project approval committee.
  2. Master level project will preferably done as individual but in case of large project, maximum of two students will be allowed on approval of Degree project approval committee.
  3. In case of two or more students, the project work must be clearly defined for each individual.
  4. This is a 6 credit hour course (divided into two semesters, (3 credit hour/semester) and be shall be graded as other modules in the semester.
  5. In the first semester of registration of the degree project, APPROVED project proposal must be submitted along with two monthly reports to the supervisor.
  6. In the second semester of the degree project (hardware/software), two monthly reports, along with degree project report, must be submitted for evaluation with the dates specified.

Instruction for Students:

  1. FORM-A, FORM-B (FORM-1, if applicable), must be submitted by individual or group registering for degree project.
  2. Complete up-to-date transcript of all semester, prior to the semester registering the degree project must be attached by all the individuals in a specific group.
  3. All members of the group MUST signed [Line 15 of Form B] this form (else shall not be considered as part of the group registering the degree project)
  4. Project Deadlines as stated to be followed strictly.
  5. Display of your degree project work at Bahria University Open House (BU-OH) is mandatory; degree project shall not be marked otherwise.
  6. If the project is not completed in the time specified. The individuals and each member in a case of group have to register their project for the academic year and pay the full fee.
  7. Student not showing his/her project progress for two consecutive weeks, his/her absence shall be reported to the concerned head of department for further actions.
  8. Student not showing his/her project progress for five weeks, his/her registration for the project shall stand cancelled and he/she will be required to re-register with payment of full fee.
  9. Student should inform to the project coordinator about continuous non-availability of the supervisor.
  10. Using an extra-sheet where ever needed while answering to the questions in Form B. [ To be submitted – hand-written]

Evaluation of the Project

  • Continuous evaluation of the project will be done by the concerned supervisor. 20% marks of the total evaluation are allocated for submission of regular monthly progress report.
  • On the completion of the project the marks distribution will be allocated as mention below:
    • - Regular monthly progress report      20
    • - Presentation & Demonstration            40
    • - Project Report                                           40
  • Project will be finally evaluated by the following:Award List will be signed by the external examiner, internal examiner, supervisor and head of the department.
    • - External examiner
    • - Internal examiner
    • - Supervisor
  • One internal examiner will be appointed by the head of department from the current regular faculty of the University.
  • External examiners will be called for evaluation from the approved list of examiners by the Bahria University, Islamabad.
  • External Examiners will be mostly appointed from reputed industries/academic institutions on recommendation of Head of Department.

Instruction for Supervisor:

  1. It is advised that supervisor and the concerned student(s) shall meet at least one hour per week.
  2. Per week schedule should be displayed outside the office of the concerned supervisor.
  3. Project file shall be checked once per semester.
  4. Project file must contain all FOUR progress report submitted by individual/group.
  5. Before final submission of Project file, supervisor is requested to ensure it contains monthly progress report of every student.
  6. Project file for each project is to be maintained by the concerned supervisor.
  7. Timely Warnings in writing should be issued to the students for not showing any progress of the project and also be notified to the project coordinator.